Flower Pot interchange to be commissioned today

Facebook
Twitter
LinkedIn
WhatsApp
Telegram
Email

President Nana Addo Dankwa Akufo-Addo is set to commission the Flower Pot Interchange today, Tuesday, November 19.

The new flyover is expected to ease traffic congestion along the north-south corridor of the Tema Motorway.

batch Flower Pot Interchange4 Channel1 News Flower Pot interchange to be commissioned today

This development aims to streamline movement between areas like Cantonments and Burma Camp to East Legon, Spintex, and Tema, significantly enhancing residents’ quality of life.

batch Flower Pot Interchange2 Channel1 News Flower Pot interchange to be commissioned today

Key features include an 802-meter dual carriageway viaduct surfaced with asphalt, a 140-meter ramp from Shiashie onto the viaduct towards Airport Hills, and an 80-meter ramp connecting the viaduct to the Motorway towards Tema.

batch Flower Pot Interchange1 Channel1 News Flower Pot interchange to be commissioned today

The GHS 677,839,999.5 interchange also incorporates a newly constructed road through the old East Legon tunnel, a 200-meter link from Cantonments via the Giffard Road interchange, a redesigned Flower Pot roundabout, pedestrian walkways along the flyover, and road accessories like streetlights, markings, and traffic signals.

batch Flower Pot Interchange Channel1 News Flower Pot interchange to be commissioned today

Initiated on March 7, 2017, the project was handled by China Railway No. 5 Engineering Gh. Ltd, with Deoke Consult Ltd as the consultant. It spanned 93 months and was financed by Afrexim Bank and the Government of Ghana.

#GhanaPolls2024
#ElectionBureau
#CitiVerify

Share this post :

Facebook
Twitter
LinkedIn
WhatsApp
Telegram
Email